Rack Installation.
The physical
installation of the racks is not a difficult task. Here is a step by step
outline of the procedures involved, starting with the lower rack box.
-
Clean and deburr
all surfaces that the racks, shims, and spacers will come in contact with.
-
Some set-ups
use a spacer to space the rackout to the front of the rack box. This
spacer is needed in some cases to cut cycle time or, to separate racks or,
make clearance due to part configuration.
-
The racks and
shims must also be clean and free of burrs.
-
Clean and deburr
the sides and bottom of the rack spacer (s).
-
Set spacer (if
required) to the back of the rack box.
-
Set shims (if
required) to the back of the rack box or the front of the spacer.
-
Set the rack on
top of the adjusting wedge orshim (s) making sure it is pushed against the
spacer or the back of the rack box.
-
Set verniers to
the desired settings as determined in the "set-up procedure".
-
Install rack
side bolts and snug (fig. 2).
-
Tighten the
vertical set screws (fig. 2).
-
Tighten the
pusher screws (fig. 2).
NOTE: Do not over
tighten these pusher screws.Especially on older model machines, these screws can
move the heel blocks out of position. (More on this later)
-
Recheck the
position of the verniers and tighten all screws being careful not to over
tighten.
The procedure is the
same for the top rack with the exception of the fact that the rack should be
installed before the shims. This is due to the fact that everything is upside
down.
SAFETY NOTE:
If at any point during the installation of racks, shims or spacers, one of these
objects starts to fall, protect your feet and let it go. Serious injury can
occur to the hands and feet trying to stop these objects from falling.
|Home|
|Technical| |Products|
|Comments| |About
Us|
WEST MICHIGAN SPLINE, INC.
156 Manufacturers Dr.
Holland, MI 49424
Phone 616.399.5550
Fax 616.399.3743
Email: splinehead@aol.com
|
 |
Manual
loading, unloading, and operation
Manually
loaded, unloaded machine with semi-automatic cycle
Fully
automatic machines
Set-up
Procedures
Rack
Installation
Adjustments
Theory
Materials
|